En12811 Steel Q355b/ Q235B Ledger Facade Ring Lock System Scaffolding with Layher Allround Building Construction Material
Q1: Are you a factory or trading company? A: We are a factory specializing in manufacturing all kinds of scaffolding mat
Send your inquiryDESCRIPTION
Basic Info
Model NO. | LG03 |
Material | Steel |
Type | Fixed |
Structural Style | Multi-Pole Scaffolding |
Framework | Combined Scaffolding |
Supporting Mode | Floor Type Scaffolding |
Lapping Form | Cross Ring Scaffolding |
Erection Position | External Scaffolding |
Move Method | Attached Lifting Scaffolding |
Scaffolding Part Type | Scaffolding Props |
Construction Properties | Building Scaffold |
Surface Treatment | Hot DIP Galvanized/Pre-Galvanized |
OEM/ODM | Available |
Validity | More Than 20 Years |
Thickness | 3.0mm/3.2mm |
Delivery | About 20-30 Days After Deposit |
Factory Certificate | ISO9001:2015 |
Certificate | SGS,CE |
Application | Building/Tunnel/Bridge Construction |
Loading Port | Tianjin or Qingdao |
Raw Material | Steel Q355b,Q235B |
Color | Silver/Red/Blue/Grey |
Connect Method | Wedge Lock/Ring Lock |
Way of Quoting | by Piece or by Weight |
Sample | Available |
Business Type | Manufacturer and Exporter |
Transport Package | Steel Rack |
Specification | 300mm 600mm 900mm 1200mm 1500mm 1800mm 2100mm |
Trademark | HDRL |
Origin | China |
HS Code | 73084000 |
Production Capacity | 500 Tons/Day |
Product Description
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2: Where is the loading port?
A: Qingdao Port or Tianjin(Xingang) Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS, and TUV certification.
Q5: Can I get some samples?
A: Yes, Sample is free, but usually the customer will pay for the shipping cost.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.
Q8: What is the payment methods?
A: T/T or L/C.
Related Products
-
Zinc Coating Aashto M180 W Beam Highway Guardrail Steel Traffic Barrier for Sale
-
Traffic Safety Steel Anti-Collision Crash Cushion Highway Barrier for Sale
-
Outdoor Portable Exhibition Concert Events Wedding Stage Lighting Show Speaker Aluminum Truss for LED Display
-
ISO9001 Galvanized Iron Aluminium Aluminum Pallet for Storage with CE